Prefabricated steel structure bridge

1. High strength and lightweight design

  • Using specialized bridge steel with a tensile strength of ≥ 550MPa

  • Reduce weight by 40% -60% compared to concrete structures and lower foundation costs by 30%

2. Rapid construction

  • Modular prefabrication (factory completion rate ≥ 90%)

  • On site bolt connection, 200 meter main beam will be erected in 7 days

3. Green and low-carbon

  • The material is 100% recyclable, reducing carbon emissions by 65% compared to concrete

  • Optional photovoltaic barrier system (annual power generation of 150kWh/linear meter)


  Contact Now
Product Details

Introduction

Steel bridge is a type of bridge that primarily relies on steel as its load-bearing structure, namely steel structure bridge and steel bridge. Prefabricated steel bridges have been widely used around the world. The original prefabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938.  

Steel structure bridges have significant high strength and lightweight characteristics, and high construction efficiency. The fully prefabricated assembly structure enables more precise precision control, saves costs, and meets the requirements of complex landscape shapes. It is particularly suitable for scenarios that require high structural performance and aesthetics, such as crossing rivers and urban overpasses.


 Prefabricated steel structure bridge


 Prefabricated steel structure bridge

 Prefabricated steel structure bridge

The bridge in the above picture is a photo of the on-site installation of our company's Ivory Coast project, which adopts prefabricated steel structure modular installation. Meanwhile, customized steel structure bridges have many advantages.


1. High strength and light weight

Q345qD/Q420qD specialized bridge steel is used, with a yield strength exceeding 420MPa. Compared with concrete structures, the weight is reduced by 30% -50%, and the foundation cost is reduced by 20%.

2. Rapid construction

Modular prefabrication (factory completion rate of 85%), on-site bolt connection, and single span 200 meter bridge erection cycle can be shortened to 7 days (traditional processes require 30 days), reducing traffic impact by 70%.


In the future, Guoshun Group will continue to use technological innovation as the engine, craftsmanship as the foundation, digital design, intelligent manufacturing, prefabricated installation, and intelligent operation to continuously provide customers with convenient, efficient, and reliable steel structure products and services, and actively contribute to the development of new construction industrialization.