On site installation of bridge project in Cote d'Ivoire
The Ivory Coast steel structure bridge project is undertaken by Guoshun Company for drawing design, steel structure generation and manufacturing, and installation guidance. At present, the project is in the on-site installation phase.
Steel structures have shown outstanding comprehensive advantages in the field of bridge engineering construction. Its high-strength characteristics enable bridges and overpasses to achieve larger spans and lighter self weight, greatly reducing the workload of the lower structure and minimizing interference with ground traffic. Compared with traditional structures, the construction methods of factory prefabrication and on-site assembly shorten the construction period. The application of weather resistant steel materials and long-term anti-corrosion coating systems in steel structures has enabled bridge structures to have a service life of over a hundred years in harsh environments. Modular design facilitates later maintenance and partial replacement, and has significant cost advantages throughout the entire lifecycle.


