Guoshun Group - your trusted partner. Guoshun Group participated in the construction of the Yunba project in Jinan High tech Zone, focusing on planning, generating, and installing steel structural components based on drawings. From production and manufacturing to installation and trial operation, turn a thin blueprint into a reliable steel structure building.
Manufacturing advantages of Guoshun Group:
1.Strong R&D and Design Capabilities:
Operates 1 research institute, 2 Class-A design institutes, and 10 technological innovation platforms.
Holds over 20 design, construction, and manufacturing qualifications and 600+ patents.
Recognized as a National High-Tech Enterprise with hundreds of national, provincial, and municipal honors.
Committed to green, energy-efficient, and low-carbon industrial branding under the philosophy of "Rowing Together in a Big Boat."
Equipped with a 15,000-square-meter R&D center.
2.Comprehensive Certifications & Standards:
Certified by EU CE, International ISO 3834 (Welding Workshop), ASME (U.S.), and ACRS (Australia & New Zealand).
Multiple personnel certified in CW and IWE examinations.
Business spans over 20 countries and regions, including New Zealand, Chile, Australia, Italy, Tanzania, and Qatar.
3.Advanced Manufacturing Facilities:
China’s first "Zero-Carbon Smart Industrial Demonstration Community."
Equipped with the nation’s first "Full-Process Intelligent steel structure Production Line."
Quality Assurance:
100% weld inspection (VT/UT/MT per ISO 17635).
Third-party verification (SGS/BV).
4.Global Logistics Trade Terms:
FOB (Free On Board) / FCA (Free Carrier) / CIF (Cost, Insurance & Freight) / CFR (Cost & Freight) / DDP (Delivered Duty Paid).
The above are the steel structure manufacturing advantages of our country's Shun Group. Now let's focus on the specific details of our project:
Recently, the Jinan Low Capacity Rail Transit High tech East Ring Road Project has made significant progress. In this project, Guoshun Group completed key tasks such as steel canopy and ancillary steel structure engineering, demonstrating efficient construction capabilities and excellent technical level. The above are the photos taken during the production process of our project components. Guoshun Group has undertaken the steel canopy and ancillary steel structure projects for nine stations including Century Avenue Station, Experimental Middle School Station, and High tech No.1 Middle School Station in the fourth section of the Jinan Low Capacity Rail Transit High tech East Ring Road Project. The project faces many difficulties such as tight schedule, complex structure, and wide coverage. However, Guoshun Group has ensured high-quality and timely delivery of the project by scientifically arranging the construction schedule and reasonably allocating production and construction personnel, demonstrating strong strength in the field of steel structures, effectively promoting the formation of a three-dimensional transportation network, and promoting the integrated development of industry and city. Here are the on-site photos we took during the installation of the project.
In the future, Guoshun Group will continue to use technological innovation as the engine, craftsmanship as the foundation, digital design, intelligent manufacturing, prefabricated installation, and intelligent operation to continuously provide customers with convenient, efficient, and reliable steel structure products and services, and actively contribute to the development of new construction industrialization.
The following types of interested companies can contact us:
1. Engineering companies that require partners;
2. Equipment manufacturers that expand production capacity;
3. Traders seeking quality certification suppliers;
If there are any requirements, we can provide: drawing design and drawing refinement, quotation list, installation guidance, etc.
Submitted successfully
We will contact you as soon as possible