BRT Project in Tanzania

The first BRT rapid transit system in Tanzania, the first phase of which was put into operation in 2016, was constructed by a Chinese company and significantly improved the public transportation situation in the city.The core advantages of prefabricated steel structure stations include: factory modular prefabrication and on-site assembly are carried out simultaneously, which shortens the construction period by 30% -50% compared to traditional modes, significantly reduces on-site wet operations and weather effects, and is suitable for rush projects. Modular prefabrication and on-site factory assembly are carried out simultaneously, which shortens the construction period by 30% -50% compared to traditional methods, significantly reducing on-site wet operations and weather effects, making it suitable for rush projects.


  Contact Now
Product Details

Prefabricated steel structure stations can adopt both factory modular prefabrication and on-site assembly, which shortens the construction period compared to traditional modes, significantly reduces on-site wet operations and weather effects, and is suitable for rush projects.

Steel Structure BRT Station


Steel Structure BRT Station


Steel Structure BRT Station


The steel structure bus station is made of high-strength steel, which is stable and durable in structure. It adopts a modern minimalist style and is suitable for various scenarios such as urban roads, communities, and scenic spots. This design balances aesthetics and functionality, providing needs such as waiting, sun and rain protection, and information display, and can be customized to suit different urban styles.

Core functions

1. Modular design: Standardized production of components, easy installation, support for rapid construction, and reduce impact on traffic.

2. Multi functional configuration: optional facilities such as LED lighting, advertising light boxes, intelligent electronic station signs, seats, trash cans, etc.

3. Resistant to adverse weather conditions: The sloping roof design can prevent water accumulation, and some models can improve wind and earthquake resistance performance (such as customized in typhoon areas).

4. Environmental protection and low maintenance: The materials are recyclable, and the surface treatment process reduces daily maintenance costs.


Send your message to us